SPOTLIGHT PROJECT

Zirkle Fruit Cherry Line - The World's Largest!

Headed up by our Lead Man James Beckett, and completion in May 2016, this Design Build project started off with a complete removal of the original Cherry Line after 2015 harvest.  The roof was demolished and a new structure was built, raising the roof by over 16' to accomodate a Mezzanine for the Box making machines.  The floor was also removed to allow for new drains, water and electrical conduit.  We installed an amazing 16 miles of conduit under the slab to for connection to the equipment with only one conduit that was unaccessible!  New LED lighting was installed in the accoustical ceiling and all was complete start to finish in 8 months! It was a pleasure working with Zirkle Fruit, Scout Lake Construction and Van Doren Sales on this Project.